Slideshow

 

Eagle P3 SBE & DBE 7-29-2011

Eagle P3 SBE & DBE 7-29-2011

The color specific map demonstrates DBE and SBE specific goals for each of our projects.

 

DBE SBE Goals

DBE SBE Goals

Goals for the Design/Build phase are:

  • 19% DBE for design work on DBE qualifying work
  • 20% DBE for construction on DBE qualifying work
  • 19% SBE for design work on SBE qualifying work
  • 18% SBE for construction on SBE qualifying work

Goals for the O&M period are:

  • 17% SBE for all services during O&M period