DBE/SBE Goals
Eagle P3 SBE & DBE 7-29-2011
The color specific map demonstrates DBE and SBE specific goals for each of our projects.
DBE SBE Goals
Goals for the Design/Build phase are:
- 19% DBE for design work on DBE qualifying work
- 20% DBE for construction on DBE qualifying work
- 19% SBE for design work on SBE qualifying work
- 18% SBE for construction on SBE qualifying work
Goals for the O&M period are:
- 17% SBE for all services during O&M period